Share Add feedback

Answers from contractors near Columbus , OH

What can I do about concrete driveway cracking 6 weeks after it was poured?
Aug 14, 2017
Check the frequency and depths of the control joints/sawcuts they installed for your driveway.  They all are subject to industry standards.  A driveway that is 4" thick should have control joint/sawcu ... read more
What size nails are required for Structural insulated sheeting .5 inch foam board.
Aug 13, 2014
This is based entirely on the Manufactueres recommended installation techniques per the scope of work to be performed.  Such as location, what your fastening to etc.

Find more contractors near Columbus

Find Contractors