Edesia Kitchen & Bath Studio
Feedback report for

Edesia Kitchen & Bath Studio

GuildQuality surveys

This page contains feedback collected by GuildQuality using impartial third party surveys. Learn more
Of 8 respondents, 8 left a review
5
8 of 8 would recommend
8
0
0
0
0
No rating
0
How are reviews verified?


L.A.J.

Review of Rhino Shield of New England by

· Waltham

We were amazed at the amount of hand work and attention to detail that went into the preparation for the paint application. Our contractor started and finish without long delays and excuses. They came did their job and finished in a timely fashion.... more

C.G.L.

Review of Steveworks LLC by

· Waltham

We were pleased working with Steveworks. Steveworks was easy to work with, fair, flexibile, responsive, and helpful in the project visioning. In particular, Steveworks made it clear that customer satisfaction was important, both rhetorically and in action. Occasional miscommunication and a few mostl... more

Peter L.

Review of Apex Solar Power by

· Gloucester

Apex exceeded my expectations in all aspects of the project. The office staff was excellent at managing the finance/regulatory stuff, keeping me informed as they took care of almost all the details. The project manager kept me updated frequently and installation went smoothly. The only hickup was an... more

Peter R.

Review of Kohler Bathroom Design Service by

· Wilmington

I have a small bathroom and it needs to be redone with handi-capped and elderly access in mind. Kohler's original bathroom design, did not meet my needs. After I received my design package, they contacted me, as a follow-up, to make sure I was satisfied with my design. After chatting a bit about... more


Inspection of the attic space after the new roof I noticed nailing for ridge vent split wood, is this still secure enough and should there be a bug barrier
Sep 23, 2018
The pictures were very helpful - thank you.  It looks like only the first ply/layer came apart which is not optimal but minimal risk for coming apart allowing the ridge vent to come off especially if ... read more
what is the process to cancel contract with in the three day period? The paperwork is missing (unreadable) that information due to printing issues.
In MA we have the three day right of recession policy. Our contracts have a Notice of Cancellation document that is in NCR form. The homeowner mails or faxes back a signed copy within three days.  If ... read more
Last edited Apr 12, 2016 11:03am

Learn why professional home builders and home improvement contractors join our community of quality.

Get started

GuildQuality

Feedback report

The feedback presented on this page was collected by GuildQuality from Verified customers of Edesia Kitchen & Bath Studio using our impartial third party survey process. To learn more about GuildQuality and our survey process visit www.guildquality.com

Edesia Kitchen & Bath Studio

217 Middlesex Turnpike,
Burlington, MA
https://www.edesiakbs.com/ (781) 238-8800