Not much info here to make a determination. Drainage issues can be tricky. Depends on what the builder was engaged to do (was the contract specific about installation of a certain system, or was it ... read more
The best move would be to simply make sure the existing vapor barrier product is installed properly (flush to ceiling below) and add blown insulation over top to to get the best R value and at the lea ... read more