Antonio is extremely good at coordinating & taking care of clients in face of difficult circumstances
They have good customer service.
The overall experience was great. Responsive, professional, caring from all staff we worked with.
ATI was very responsive and courteous to our project. ATI assistance was great.
The communication was not fantastic.
They just do great work.
Easy to work with completed job fast.
They showed up on time and completed the work within the time limit.
The Project Manager, Jay, was outstanding and stayed on top of all of the work being done. He was an excellent communicator with the customers and the insurance company.
They are very professional.
ATI assured us that their “one‑stop shop” service and top project manager Frank Sorbello would make the process of our restoration easy, instead we encountered vague reassurances, no clear timeline, and little actual management. Our claim began on April 2nd, and we lost use of our kitchen that day. We were told no flooring, painting, or other work would be done until cabinets were installed, causing major delays. We reached out to Jason Rains due to these delays; he was instrumental in getting the tile and paint work started. We were unable to receive any replies from Frank's manager, Shonda Hacker. We were told cabinets would be built on site, measurements were taken, and progress was supposedly underway. Two months later, we were informed the cabinets could not be completed and might not arrive until late August. We reached out to We eventually had to accept different cabinets just to move the project forward.
Even then, workmanship was unacceptable. Drawer bottoms were damaged and replaced with thin, rough wood, then replaced again with plywood that still did not match the originals. Doors were ordered incorrectly, handles were installed wrong, and items had to be reordered. We lost cabinet and drawer space because the correct cabinets were never ordered. In the bathroom, a vanity much larger than our original was installed without informing us of the size difference and that the electrical outlet would need to be moved. Thin‑set waste was thrown onto our pool pump and into our yard. Our garage was used as a trash storage area, our tools and extension cords were used without permission, and drywall work was done poorly and had to be redone. The drywall installer frequently arrived without notice, worked briefly, then disappeared for days.
Ten cases of our tile were taken from our garage without explanation, Frank did not know why. Due to Nate's diligence, it was later returned. Items we specifically listed as “fragile—do not pack out” were packed out anyway. Communication was consistently lacking; we were rarely told what was happening, when it would happen, or why. Temporary labor and unqualified workers were used. Our kitchen countertop was broken. Wood walls in our living and dining rooms were damaged and never repaired. Grout was left on new tiles, walls, wood surfaces, and even our entry door.
All of this occurred while my wife was working from home, making the extended timeline and constant disruptions even more stressful. We trusted ATI and Frank Srbello and the result was months of chaos, frustration, and substandard work. The level of mismanagement and the quality of the restoration we received were far below what should be acceptable under an insurance claim.
Thankfully, Nate Strutzenburg, stepped in to smooth things over and take control of the project. It was only due to his care and communication; we kept working with ATI. The clean-up crew was able to clear up the door and mess caused by the restoration. The countertop was repaired. We've been advised we will be reimbursed for the damage to our wood walls. We hauled away almost all of the garbage, left in and around our home.
Now that the work is finally complete, we are relieved to have our home back, but the experience was unacceptable and needs to be formally acknowledged.
ATI is a great company, and they took good care of me and my family.
Eric Wingham is fantastic
Mark up seemed excessive
They have great customer service and quick responses.
They are an awesome company to work with.
Everyone we’ve been in contact with has been professional and helpful
Jason and his team did a beautiful job with the demo piece of the project. They were on site very quickly and completed the demo and dry out within 4 days. Their communication, professionalism and work quality were outstanding. Jason provided a mop sink and folding table to make my kitchen functional until the restoration was complete.
Frank, the restoration project manager, and Larry, the craftsman, worked together to complete a high quality restoration. I am pleased with the quality of my restored kitchen. They were both professional and easy to communicate with.
My one significant complaint was the 3 week break between the end of demo and the beginning of restoration. The two departments need to communicate more effectively with each other to limit these losses of time
Everyone who came to our home for this restoration project was extremely professional and helpful in our understanding of what our project entailed. Very happy with Tara and Mike, especially, who kept us in the loop throughout our need.
Excellent results
Yes, Quick to respond, assess and start the project.
It was very nice to have someone in charge of this project and not try to do it myself
No. Though ATI was courteous and professional in texts and emails, I didn't feel properly guided through choices and the entire restoration took about 10 months for new flooring in kitchen, carpet padding in a couple rooms, baseboards, and one cabinet rebuilt. The flooring crew was not good. I wasn't coached through flooring choices properly, and this resulted in extra work, more visits, and flooring that I do not like at all. My cabinet was rebuilt and upon installation, found to be too large for the space. This required an additional visit. Upon the next visit the cabinet and cabinet doors were different colors. This required another visit. There are too many disappointing details to go through, but I would not use this group again.
On time thoroughly explained everything
Did a nice job, craftmen were qualified, kept us informed on progress & appointments.
I was well informed of what the process was going to be.
Full, dedicated support from top to bottom, office to field staff.
They were very polite and did what they promised. If it wasn't possible, they said they couldn't do it. If they said they would be here at 6:00, they would be here. If they were delayed in traffic, they would call and let me know it would be 6:15. They were very polite and considerate.
Both ES & Repair crews were professional and took care of business in a timely manner
ATI does a great work.
so responsive and professional
Every one that came to my home to restore the damage were very kind and kept me informed about the work they were to do and did a good cleanup job at the end of the day.
Professional from start to finish.
Very professional! Attention to detail was incredible!
Yes, I would recommend it him because he works with our schedule. It was very prompt when he said he was gonna be there and I appreciate it that.
For the most part, I didn't have any problems with them, but I did have a problem with another company they referred.
Communication is excellent, work was done at a timely pace.
Tiles not aligned large gap from tile to base board and over $500 charge for 1 day of fan dry out
The "Residential Work Authorization - Arizona" stated the work would start on 10/17/25 and would be substantially completed by 11/14/25. It was completed on 1/14/2026. ATI scheduled one month, but it took three.
The process started on September eighth, twenty twenty-five, and they completed the job on January twelfth, twenty twenty-six. The job consisted of fixing the shower and the closet, so it took them five months to complete the job.
Excellent work
Case manager (Jay) very nice and helpful when you’re meeting with him.
You abandoned my project half way through.
We have used ATI Restoration a number of times at various facilities. They have always stepped up and taken care of what we needed to do, in a minimal time and very professionally.
Our Senior Project Director Boston Whitlow managed the process from start to finish while keeping us informed every step of the way with our roof leak.
His guidance was knowledgeable, professional and thorough.
Terrible job . The tech who was assigned our job seemed to be inexperienced or unwilling to do the job as specified.
I was referred by Chris Karas who referred your company. I explained him that I needed another contractor due to the poor workmanship. Chris’s referred me to a better contractor. In addition I attempted to add a small touch up Item. I asked 3 times for a quote that was never given. It seemed that they wanted me to green light the change order without a quote. Based on my final experience I gave up asking .
Excellent Response Time and Great Communication from Anthony Colon
Frank and Boston were very helpful and took the stress out if the whole experience. Boston worked directly with my insurance company to get me the total reimbursement needed for the job.
Each time the team comes out, they are so helpful in moving, disposing and relocating items.
I am extremely disappointed with the work completed by this team. Communication throughout the project was consistently inadequate, and we had to call and email repeatedly just to get basic answers. There are numerous issues with the installation that require attention. No vapor barrier underlayment was installed under the floors, causing corners to cup and worsening over time, and sections that needed leveling were installed as-is, resulting in warping and dips along the hallway. Faucets and shower fixtures were installed incorrectly, backwards! creating safety hazards for our little girl, and tubs were left detached from the floor. Paint was left on door handles, and door frame replacements caused wall damage that was never repaired or repainted. One bathroom floor is uneven, creating a tripping hazard, and the shower flange and tub spout were improperly installed with no follow-up despite assurances. New toilets were left uninstalled, with no sealant applied at the base, and faucets were only temporarily fixed with excessive silicone rather than proper installation. Overall, it was a constant struggle to get anything done correctly, and we were repeatedly blamed for delays due to our "choice of materials" that at the end it was provided by team. The floors and all affected installations need to be reviewed and corrected, as the quality and safety of the work were completely unacceptable.