Absolutely not, having 1 person do 2 full bathrooms was way too much. I was told it would take 2 days, it took 6 including working until 11pm and on Easter Sunday.
The installer sent was relatively local and a wonderful guy. The contracted plumber he was forced to use was adequate for the shower install; but left me with a leak on the exterior that I fully disclosed would need to be fixed. I was extremely unhappy that the plumber refused to do both the shower connections and the cap off while the drywall was already tore off. Ultimately, the installer cleaned up after the plumber who just tossed the pipe garbage in the yard and he put up some plastic to protect the newly installed work. So, ultimately this company admits there was communication breakdown, but offered nothing toward fixing my problem. This will cost me money and time and if more deconstruction has to happen; I won't reccommend them ever. However, the work the installer did was wonderful and looks beautiful. He was the class in the whole act. I got his card for future projects.