John Ramey asked:

Mar 9, 2014
How much does a built-in cast iron tub (circa 1930) weigh?
Jun 18, 2015

They start at 250/260 lbs and go up from there. I haven't run into any over 500lbs, but I'm sure they're out there.

Jun 4, 2015
how can I leave a review on this sight about a bogus contractor?
Jun 18, 2015

We are going to need more information to better understand the situation.

John Ramey asked:

Feb 18, 2014
We need a good, reliable general contractor to help us with a bathroom renovation. How do I find one that won't charge us more because of our address?
Jun 17, 2015

Like everyone else has mentioned you have to do your due diligence in securing a high quality contractor. However, you the client may want to switch the context of the question. If you are implying that your residence address has an assumed effect on the face value of your estimate, then I would have to make the assumption that your address dictates a certain level of implied “quality” if you will. So if your tastes and  design are at an architectural standard  that requires high end craftsmanship and the price point will reflect such expertise. When doing a project in your home you always want to pay for the knowledge and not just the brawn. If you were remodeling a kitchen in a small rental apt in a college town community your price point again would reflect the simplicity of the job. Hope this helps…

Feb 17, 2014
What should I look for when hiring a remodeler for my kitchen project?
Jun 17, 2015

If you have made the decision to hire a contractor to complete any home improvement project I would recommend they meet the following minimum qualification(s)

  1. Make sure they are licensed in the field they work in
  2. Make sure they have insurance $1M minimum
  3. Make sure you can work with their demeanor...If you have a Type A personality dont hire a laid back non chalant contractor 
  4. Make sure the estimates and/or proposals are written and cover the scope of work in detail
  5. Hire the right person for the right task...dont ask a carpentar to replace your electrical panel.
  6. Never pay 100% of contract price, agree upon a payment schedule i.e. 33% down at signing, 33% at project start and remaining balance to be paid upon substansial completion.
Jun 4, 2015
how can I leave a review on this sight about a bogus contractor?

Bruce Wiegan of BNW Builders PRO answered:

Jun 13, 2015

Who is the contractor and what did thet do?

Jun 4, 2015
how can I leave a review on this sight about a bogus contractor?
Jun 10, 2015

What do you mean by bogus?  Is he not a real contractor, or did you have a bad experience with him?

Jun 4, 2015
how can I leave a review on this sight about a bogus contractor?

Geoff Graham of GuildQuality PRO answered:

Jun 4, 2015

If the company is a Guildmember, you should be able to submit a review in the bottom right-hand corner of their profile page. For companies that are not Guildmembers, we don't presently accept reviews.

Feb 17, 2014
What are some inexpensive and non-permanent backsplash ideas for a kitchen in a rental apartment?

Complemenary paint with countertops scribed to the wall is a clean look.  If you use eggeshell paint, it is durable too.

Jan 13, 2015
I'm thinking about remodeling my kitchen, but have been cautioned to build in a substantial "cushion" for change orders. What is a change order exactly?

When interviewing contractors, check online reviews and call references to make sure the company has a track record for being on budget.  After vetting the contractor, with detailed plans and specifications you don't have to worry about change orders unless you make changes.  I usually suggetst to homeowners to have a 5% - 10% contingencydepending on the size of the project, not for change orders, but for addtions or upgrades they may want.

Jan 13, 2015
I'm thinking about remodeling my kitchen, but have been cautioned to build in a substantial "cushion" for change orders. What is a change order exactly?
Jan 16, 2015

Glen offered a very accurate and thorough answer to the question. The only thing I would add to it is the importance of receiving a detailed construction contract from your contractor. This should list (as Glen mentioned) model numbers, etc. What you should stay away from are "allowances". They are the number one driver for change orders. Allowances are often used in a contract when either the homeowner hasn't made a decision on a finish or fixture or the contractor is unsure how to bid a specific portion of the project. Inevitably there will be confusion as to what the allowance truly allowed for and what the final product/ decision did to the original price.

Best bet is to wait and start your project after you've made all the selections- and then figure that inspiration will strike you when you least expect it and you'll be adding that 10% at some point.

Have fun!

Jan 13, 2015
I'm thinking about remodeling my kitchen, but have been cautioned to build in a substantial "cushion" for change orders. What is a change order exactly?
Jan 13, 2015

A change order is written (or at least should be) any time there is a 'change' in the original scope of work for your project. It documents this 'change' and any additional cost (or credit) that you as the homeowner may incur. For example: your contract clearly specifies that you have selected laminate countertops for your kitchen, but shortly after the contractors begin demolishing your existing kitchen you decide you want to upgrade to quartz countertops. The contractor will write a change order specifying this change and what the additional amount will be. If you accept, both parties sign the document and each gets a copy. It now becomes a legal addition to your contract. Probably the most common causes of a change order are 1) when hidden conditions are found after the contractors have peformed the demolition phase (defects in the structure or previous workmanship in your home, dicovery of hazardous materials, etc.) and 2) because the written scope of work is vague or there simply is no written scope of work. The scope of work should be extremely detailed listing makes, model numbers, colors and finishes, door styles, etc. as well as the specific tasks to be performed. The more detailed the better. You want to make sure that both parties understand exactly what is to be done (and sometimes what is NOT going to be done) and what materials are going to be included. The best way to avoid change orders is to select a company to work with that is vastly experienced and specializes in the kind of work that you want done. There will be far less chance that they will be "surprised" when they begin constructing your project. Have a detailed scope of work and working drawings or prints that each party clearly understands and signs before the project begins. In a perfect world, if you don't change your mind during construction, there shouldn't be any change orders. A rule of thumb that I suggest to homeowners is to leave about 10% of the contract amount for contingencies. If your maximum budget is $40,000., don't sign a contract for $40,000. That leaves you no way to accomodate any change orders; whether they're for hidden conditions or, more likely, you decide to add or upgrade something to the project. Your human nature will have a tendency to do this. If, after seeing your project start to come together, you decide that a little addition here and there would now be the perfect compliment to bring your kitchen to another level, you will have set aside a little extra money to be able to do that.

John Tuseth asked:

Nov 1, 2014
What is the best way to remove a very slight amount of mold on shower grout? What is the BEST sealer to use for re-sealing the cleaned grout?
Jan 2, 2015

BLEACH IT! 

BOMB SQUAD ANSWER// HTH or better known as house hold bleach. As an Explosive Ordnance Disposal Operator House hold bleach can be your greatest weapon for biological items such as mold. Add a little dawn soap to stick to the surface.  Spray, allow to treat, and then scrub and rinse! 

Pres Gavigan Construction http://gaviganhomes.com/about-us/

Billy Gavigan 

John Tuseth asked:

Nov 1, 2014
What is the best way to remove a very slight amount of mold on shower grout? What is the BEST sealer to use for re-sealing the cleaned grout?

Mike Goldberg answered:

Nov 13, 2014

Clorox foaming spray works great.  Just spray it on and leave it sit.  No need to rinse or scrub.  It may take several applications.  It is washed off when you use the shower the next time.  it will even remove mold behind the caulk after several applications.

John Tuseth asked:

Nov 1, 2014
What is the best way to remove a very slight amount of mold on shower grout? What is the BEST sealer to use for re-sealing the cleaned grout?
Nov 8, 2014

You didn't mention if the grout was colored. Be very careful to NOT use any bleach based products on any colored grouts. Something that works good on all types of grout is bon-ami mixed with vinegar. Dig out any caulk before doing this. Let completely dry after cleaning before applying any sealer and finally caulking. We like and use Impregnator tile sealer.

Show More