Photo By Peak Improvements LTD. Whole Home Remodel

Whole Home Remodel

Main Floor: -Stripped of all finishes, electrical, plaster and insulation (only structural framing left) -Removed bearing wall and installed new beam and posts -All new electrical including LED pots -All new finishes (see finish schedule attached) -New Kitchen -Installed new water lines and electrical to add a powder room to the main floor Second Floor: -Refinished the hardwood flooring -Installed all new finishes in the bathroom -Enlarged the bathroom -Added a closet to one bedroom as part of bathroom enlargement -Added electrical for a makeup table