John Ford asked:

Feb 17, 2014
What are the top 3 energy efficiency upgrades I can do to my 2-story home?

Josh Way of Jarrett Industries PRO answered:

Aug 11, 2016

Step one, if you have siding use a insulated vinyl siding with silica gel. Replace your windows with a double or triple insulated window system. And third your doors are very important. When you do replacement anything you want the doors and windows to fit the space perfectly. We can do these things and more at Jarrett Industries.

May 18, 2016
What are the phases of a kitchen remodel and in what order? How does the pricing of material and labor get explained in an estimate?
Jul 29, 2016

The combination of answers above is pretty inclusive. The first responder's comments get you to the construction phase. I would add that recommendations from friends sometimes fall short if your project is of a different nature than theirs. Be sure your contractor has a track record in the type project you are considering.,

 Our estimates list out detail of the work scope included and an overall cost. When moving to the contract phase we submit a schedule of values that will be used for percentage complete pay apps. 

 As far as the construction process, this would be our normal progression:

protection - provision for temp lighting if needed

demolition and temp arrangements for appliance usage if needed

framing of new walls, floors or beams

rough plumbing If needed

rough electric for lights, appliances etc

hvac or venting as needed

insulation

drywall

tile prep, underlayment

tile or hardwood installation

more protection before cabinets to protect finished floors

install cabinets

install trim (base/crown etc)

measure/install countertops

install appliances

paint (sometimes this will  move ahead of countertops)

backsplashes

plumbing finish

electrical finish

cabinet hardware

provide & perform punch list 

remove protection

test electric, plumbing, appliance function

Note: inspections required vary by jurisdiction but for our area it will generally include foundation if an addition is involved, framing if structural changes, rough plumbing, rough electric  insulation, final plumbing, final electric, certificate of occupancy. 

Hope this helps

hire a licensed pro and avoid the pitfalls.

May 18, 2016
What are the phases of a kitchen remodel and in what order? How does the pricing of material and labor get explained in an estimate?
Jul 15, 2016

The above are two good, and siilar in approach answers, but there are two issues it seems no one includes:

1) If you house was built before 1978 it must be inspected by a certified contractor or lead paint inspector for lead paint before a remodel is started. If found the paint, or paintd material must be prperly abated. This can be a significant cost item.

2) Most remodel items like tile, cabinets, and paint are considered minor and don't require it in most jurisdictions, but electrical, plumbing, HVAC, and structural modifications require permits and inspections. A homeowner can save money by omitting them, but if you get busted, you'l pay and you may be without a kitchen for a long time.

Robert Johnson

Southern Home Improvement, LLC

Georgia

May 18, 2016
What are the phases of a kitchen remodel and in what order? How does the pricing of material and labor get explained in an estimate?
May 31, 2016

Set up includeing Dust Containment field, reverse air flow and floor protection

Demo concreete work, framing, roofing

Rough electrical

Rough plumbing

Inspection

Drywall,

Inspectioin

Mud and tape 

Cabinets and fixtures

Tile backsplash

Finish electrical

Finish plumbing

Fixtures

Finishes Painting 

Final Inspection 

Clean up

Photo Pizza Party

Each phase should show labor (both in house and sub), materials broken out

Hope this helps

Philip Anderson

HDR Remodeling 

Berkeley Ca

May 18, 2016
What are the phases of a kitchen remodel and in what order? How does the pricing of material and labor get explained in an estimate?
May 19, 2016

Each contractor has own estimating. Estimatehas to contain material selections so you can compare other contractors and know that you comparing "apples to apples". (Do not expect to have their cost broken down.)

Each phase can have estimated labor time. But that something that most likely included in to the total project cost.

Phase1. Get design done and analyze your lay out and cabinet functionality.

Phase 2. Materials to be used selection.Most impact on your budget makes your selections - door style, construction, finish. Be smart and flexible on door style to get most value for your money.

Phase 3.  Ask for referrals from previous customers from your contractor. Do your homework before you open doors for strangers. 

Phase 4. Sign contract, pay "down payment". Ask for payment and material delivery schedule for your project.

         Last but not the least. Reward your hardworking subs. 

Regards 

Manny Stiega

Apr 12, 2016
what is the process to cancel contract with in the three day period? The paperwork is missing (unreadable) that information due to printing issues.

Tim Brown JR of RGS Exteriors PRO answered:

May 18, 2016

Most states do have a 3 day right of recison. This allows a customer to cancel a contract without any penalties and or fees within 3 business days of contract. However in most cases that rule does not apply and the law does not apply if you have invited the contractor over and or if you have gone to their place of business. This law was put in place for the high pressure door knockers. 

Again if you set up an apointment with a contractor and invited them to your home the 3 day does not apply.

That said if there is a real good reason, car accident, unforseen expsences etc. most contractors will allow you out of a contract even if after 3 days. 

Lastly please keep in mind usually 30% of the cost of the job is actually before the job has started, marketing, commisions, adminstration etc. etc. 

I hope this helps.

Tim Brown RGS Exteriors and Contruction

www.utahgutter.com

801-280-3110

Apr 12, 2016
what is the process to cancel contract with in the three day period? The paperwork is missing (unreadable) that information due to printing issues.
May 2, 2016

I would agree...let you contractor know immeately by a phone all that you are excersising your 3 day option.  Then follow the cancellation by the letter of the law. 

I would recommend that you keep it professional, short an if possible friendly.  If the contractor wants to know how they could have done it better, please be factural and not immotional.

Phiip Anderson

Berkeley Ca

Apr 12, 2016
what is the process to cancel contract with in the three day period? The paperwork is missing (unreadable) that information due to printing issues.

Tom Schiebout of Tomco Company PRO answered:

Apr 14, 2016

In MN. we have the same 3 day right to rescind. This is standardized form (written legibally) in type 10 bold letter type. My understanding, it is required to be given to the client if contract you sign is in the homeowners residense. Not if the contract is signed in the our company's office. We give it to our clients either way. The 1st day starts the day after you sign and is counted daily except for weekends and holidays. 

The real issue is... if you are having 2nd thoughts about being in contract with a particular contractor. I am thinking that I as a contractor, I would certainly need to know the issues, even if after "3 days right to rescind" has passed. I typically don't order product for any project until the time period has passed. If you want to get out of your contractoral obligations, there should not be any financial obligations from your part if contract is legally rescinded according to the form and in an appropriate time period. If after there may be some fees as your contractor may have spent time to proceed with your material and scheduling process for your project. 

Hope this helps.

Apr 12, 2016
what is the process to cancel contract with in the three day period? The paperwork is missing (unreadable) that information due to printing issues.
Apr 13, 2016

Texas also has a 3 day RoR.

Apr 12, 2016
what is the process to cancel contract with in the three day period? The paperwork is missing (unreadable) that information due to printing issues.

In MA we have the three day right of recession policy. Our contracts have a Notice of Cancellation document that is in NCR form. The homeowner mails or faxes back a signed copy within three days. 

If your document is unreadable which to me is a warning sign I would call them and ask them what to do and send an email cancelling as well. 

If you have any further questions you can call me at 978-304-0495. Hope I was able to help you.

Stepahnie Vanderbilt 

www.mycoastalwindows.com 

Alex Graham asked:

Feb 17, 2014
What are the most cost effective things I can do to improve my home's energy efficiency?
Mar 25, 2016

Windows and doors are the largest culprit in lost of energy efficiency. It may not be the cheapest option but will provide you with the largest impact.

Feb 17, 2016
How to fix a screwed in loose door handle on a steel door
Mar 7, 2016

Use plumbing soder that comes in a roll.  Break off a piece and put in the hole then put the screw back in. 

Feb 17, 2016
How to fix a screwed in loose door handle on a steel door

I am assuming it is a standard steel entry door handset.  If the screws are not striped, simply tighten the screws as you would on any entry or passage set.

Feb 7, 2016
Spray foam attic ceiling to make it a conditioned space

Tom Schiebout of Tomco Company PRO answered:

Feb 9, 2016

Christofer, There is a lot written about your particular condition. What I would do would be to install a spray polyurethane insulation (closed cell insulation) into the attic ceiling and down to and including the eaves. this installed over a 1/4" plywood that would be "cleated" down at a minimum of 1" below the bottom of the roof sheathing, thus eliminating the "hot roof" situation. As far as moisture... if you understand that warm air rises and carries the moisture up (another reason i would use a closed cell product) then it makes sense to foam any walls or kneewalls as well. The venting on the top side would not be to eliminate any interior moisture, but to make your shingles last longer (keep them from overheating). Quite a few asphalt companies have disclaimers on warrantees because of this issue. You would need to check with your steel roof manufacturer how they respond to a hot roof application. 

Ok so you don't really want all that moisture collecting on your windows and or finished wall substrates in the attic. So an ERV/HRV or even the furnace fan run continuously would help distrubute or evacute the excess moisture if this is your main house furnace (air handler). FYI- change filters monthly in these systems to help mitigate possible mold issues. I recommend the 6" combustion air (bringing in dry outside air) code required in IRC. I am not sure if this furnace unit in your attic is the primary furnace (air handler) for the home. If so that would help distribute attic moisture to the lower parts of the home. If separate attic unit only, I'm not thinking it will ever distribute moist warm air to the lower level like you suggest.

Remember this... once you start changing the function of your home's ventilation/conditioned or unconditioning of a space you will be changing the whole dynamics of how the house used to function. Henceforth do your homework. All this said...I run my company business in the extreme temperature zone of Minnesota. Your local heating guys should have a better handle on providing a safe living environment for your family. Mold can be a serious issue.  